Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Institute of Research and Development
    • Journal Articles
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Institute of Research and Development
    • Journal Articles
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Resource constrained project scheduling by review relationship option case study orthopaedics building renovate project, ramathibodi hospital

    Thumbnail
    View/Open
    IRD_58_74.pdf (4.754Mb)
    Date
    2015-05-20
    Author
    อินทรทรัพย์, เอกอนันต์
    เบญจโอฬาร, วชรภูมิ
    Metadata
    Show full item record
    Abstract
    Resource leveling schedule is important for construction planning process very much, because quantity of resource such as labors is limited. The optimal solution to allocate enough resource for every activity is main principle for project successful. But in ordinary, they always observe that have different quantity of resource every time periods, is called of “Resource fluctuation”. So, planners have to adjust first schedule is called of “Resource Leveling”. This method necessary for decrease resource fluctuations or make uniformly resource demand level . However, normal method (heuristic method) to solve this problem is difficult and use much time. So in present ,there is new developed method by create model in spreadsheet computer programs such as Microsoft Excel. This new method can solve very complex resource leveling problem well..So in this research if we add vary relationship options such as SS (Start-To-Start) ,FF (Finish-To- Finish) or NO (No Relation) for activity in model, objective is increasing optimal solution flexibly and output solution is better than El Rayes & Jun ‘s Model. We can discover for optimal solution from this new model that received uniformly resource demand level of project schedule in the end
    URI
    http://repository.rmutp.ac.th/handle/123456789/1564
    Collections
    • Journal Articles [688]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV