Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Institute of Research and Development
    • Journal Articles
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Institute of Research and Development
    • Journal Articles
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    The biogas production from waste in school and the application of lunch project for student case study suksasongkhro tak school tak province

    Thumbnail
    View/Open
    IRD_58_251.pdf (1.322Mb)
    Date
    2015-06-09
    Author
    ศรีอุดม, ยุธนา
    เทวตา, อนุรัตน์
    จันทร์แก้ว, ไพโรจน์
    Metadata
    Show full item record
    Abstract
    This research aimed to transfer technology about biogas digester construction and applying the biogas in household to teachers and students in Suksasongkhro Tak school. They were instructed and trained about biogas digester construction and applying the biogas produced from animal manure on cooking in household to reduce using LPG. The research operations were separated to 4 phases. The first was preparation and making understanding. The second was instruction and practical training. The third was monitoring and project evaluation. The last one was organizing the science project event. The number of participant teachers and students was 330. From the result of 5 scale questionnaire in project evaluation, it was found that the evaluation about knowledge and understanding showed the maximum scale ( = 4.42, SD = 0.84). The second was about location, duration and food ( = 4.36, SD = 0.75). The evaluation about the knowledge showed the lowest scale ( = 4.28, SD = 0.77). For the project evaluation of success, it was found that every biogas digester done by participants could produce the biogas and it could be use to replace LPG and reduce expenditure about 1,400 – 1,500 baht/month. The total construction cost of biogas production system was 58,000 baht. So, the payback period was 3.22 years.
    URI
    http://repository.rmutp.ac.th/handle/123456789/1775
    Collections
    • Journal Articles [688]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV