Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Research Report
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Research Report
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Assessment of lightning protection performance in transmission system

    Thumbnail
    View/Open
    ENG_59_19.pdf (9.086Mb)
    Date
    2016-09-28
    Author
    Rugthaicharoencheep, Nattachote
    นัฐโชติ รักไทยเจริญชีพ
    Prakobkit, Surasit
    สุรสิทธิ์ ประกอบกิจ
    Metadata
    Show full item record
    Abstract
    This Research purposes assessment of lightning performance on transmission system 69 kV in Metropolitan Electricity Authority (MEA). The case studies illustrated the lightning strike to direct top pole in order to guideline considering the critical flashover voltage value of insulator is able to withstand it and improvement lighting protection in the future. This solution analyzes using the Alternative Transient Program-Electromagnetic Transient Program (ATP-EMTP). The result found that voltage across insulator before and after improvement lightning protection by external ground wire. Factor effect to voltage across the insulators is the tower footing resistance, wave of lightning current and interval between towers. It depends on relation with front time of wave. The analysis economics is very important. This Research is studying interruption cost of outage since back flashover so analysis the break even point of the installation external ground. The result found upon improvement lightning protection by installed external ground. The pay back period of that is 9 years installed ago. This result can conclusion is external ground able reduction interruption costs of outage.
    URI
    http://repository.rmutp.ac.th/handle/123456789/2081
    Collections
    • Research Report [286]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV