Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Independent Study
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Independent Study
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Developing microcontroller board for investigating

    Thumbnail
    View/Open
    ENG_61_25.pdf (6.811Mb)
    Date
    2018-08-15
    Author
    Suvannapum, Rapeepat
    Metadata
    Show full item record
    Abstract
    Water became an important factor for propelling production process of any industries or factories and groundwater was option for production cost reduction, especially in areas where had no surfacewater. B.Foods Product International Company Limited, an affiliate of Betagro Group, was located in Lop Buri Province to daily consume huge quantity of groundwater for production process in its factory. Measuring and recording levels of groundwater in 2 ground tanks related to volume of the water at time point of every 3 hours must continually be done every day in order to prevent lack of water fed into the factory that may impact of its production process. The main problem was caused of unexpected non-working of pumps. Knowing fluctuation of water levels could provide their immediate improvement and recover to avoid serious impacts. A microcontroller board could be employed to control groundwater volume in order that the company could closely follow up levels of groundwater in the ground tanks in real time and continuity. This study went on designing the microcontroller board for managing utility system and maintenance by using with level meter and wireless receiver and transmitter for testing working efficiency every 3 hours of each everyday during 1 February 2016 till 11 March 2016, totally 40 days. It was compared with those of same duration done manually. The findings revealed that the figured from 2 methods became similar and had very close relationship with each other. This could indicate that the simulated microcontroller board could be employed to automatically control groundwater volume efficiently. The company could bring it to appropriately trace levels of groundwater in the tanks in accordance with water usage behavior in each period of time for disruption of production process caused of insufficient quantity of groundwater. And, this could be adaptable benefits for improvement of any organizations and also for any further studies
    URI
    http://repository.rmutp.ac.th/handle/123456789/2666
    Collections
    • Independent Study [31]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV