Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Research Report
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Research Report
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    The effect of safety system in construction which result on productivity rate a case study: wall tile external building

    Thumbnail
    View/Open
    ENG_61_15.pdf (1.964Mb)
    Date
    2019-09-18
    Author
    Monkaew, Sunun
    สุนันท์ มนต์แก้ว
    Nawalerspunya, Thawatchai
    ธวัชชัย นวเลิศปัญญา
    Metadata
    Show full item record
    Abstract
    The purpose of this research is to study the effect of a safety system provided for wall tile external building activity on productivity. The safety system composed of (1) stable scaffolding system, (2) providing clean and not slip walkways on the scaffold, (3) installation of handrails not less than 0.90 meters in height along sides of the scaffold, (4) installing safety nets around outside perimeters of the scaffolding, (5) indicating working area, (6) installing stairs, (7) providing protection for people who works below, (8) providing tools and equipments for transporting material which are safe and ready for using, and (9) providing personal protective equipment for workers. Cost of the safety system is 79,318 baht for a wall tile area of 385 m2, or approximately 206 baht/m2. Productivity rates for prior and after the used of safety system are 1.91 and 1.85 m2/person/day, respectively. The productivity declines for approximately 3 %. In addition, our study found an impact of work is a height of Building, the wall tile external productivity could decrease for 6 %.
    URI
    http://repository.rmutp.ac.th/handle/123456789/3521
    Collections
    • Research Report [286]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV