Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Independent Study
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Independent Study
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Sliding aluminium doors and glass installation improvement using motion and time study techniques : A case study in glass line company limited

    Thumbnail
    View/Open
    ENG_64_07.pdf (3.178Mb)
    Date
    2020-12-12
    Author
    Sittiwong, Ratburee
    รัฐบุรี สิทธิวงศ์
    Metadata
    Show full item record
    Abstract
    This paper aim to be improvement the installation methods for Sliding Aluminium Door and Glass in order to be the good quality product by applying the motion and time study, design the new model of the receiver lock set for the sliding door. The step of study process started from studied the sliding door installation processes, gathering the works process and reducing unnecessary and duplicate of work process on site elimination, establishing standardized time for modifying the installation process. From the result before applied new method we founded that the installation process before installation process improvement, we were spent the time of installation process at 45.38 minute per set and after we used the new method we founded that the installation process time was 35.36 minute per set, it can be decreased the installation time was 10.02 minute and the efficiency of work process operation was increased 22.08 percent and the line balancing performance before improvement was 56.73 percent and after improvement was 88.40 percent and the line balancing performance was increased 31.67 percent. Unless there are the improvement installation methods, it makes the company in case study will be do the work to be delay and cannot be hand over the works just in time by the schedule planning.
    URI
    http://repository.rmutp.ac.th/handle/123456789/3531
    Collections
    • Independent Study [31]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV