Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Independent Study
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Faculty of Engineering
    • Independent Study
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Regression model development for preliminary calculate cost for a large building in Roi Et Province

    Thumbnail
    View/Open
    ENG_64_12.pdf (5.028Mb)
    Date
    2021-02-25
    Author
    Yoshchaisarn, Patikarn
    ปฏิการ โยชน์ไชยสาร
    Metadata
    Show full item record
    Abstract
    The purpose of this research was to study level of the preliminary cost calculate for a large building in Roi Et province and to study the factors that affected on initial cost reduction of large building constructions in Roi Et province. The sample group used in this research were devisers, supervisors, project managers and construction contractors in Roi Et province. There were 5 projects with a total of 145 people. The instruments used in the research were a 5 level rating estimation questionnaire. Data were analyzed by using frequency, percentage, mean, standard deviation and the hypothesis tested by using Multiple Linear Regression with (Enter Regression). The result of the research shows that An analysis of opinion on principal control of large building constructions in Roi Et province. It was found that the practice level was at the highest level. Which is arranged in order from the highest average to the lowest, namely machinery cost, material cost, contractor cost, operating cost and labor costs, respectively. and The analysis of Regression Model Development for Preliminary Calculate Cost of construction works had resulted in lowering the initial cost of large building constructions in Roi Et Province of 5 factors included structural design, architectural design, interior design, system design and exterior design. Resulting in reducing the initial cost of large building constructions in Roi Et province with statistical significance at the level of .01 level.
    URI
    http://repository.rmutp.ac.th/handle/123456789/3581
    Collections
    • Independent Study [31]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV