Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Institute of Research and Development
    • Journal Articles
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Faculty and Institute (คณะและสถาบัน)
    • Institute of Research and Development
    • Journal Articles
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Factors affecting delay of construction projects

    Thumbnail
    View/Open
    IRD_66_25.pdf (467.1Kb)
    Date
    2023-03-28
    Author
    Triwong, Titiwat
    ฐิติวัฒน์ ตรีวงศ์
    Yamoat, Nirat
    นิรัตน์ แย้มโอษฐ์
    Pongsuwan, Adisorn
    อดิสรณ์ พงษ์สุวรรณ
    Metadata
    Show full item record
    Abstract
    The research is aimed to 1) study the level and priority of the factors affecting the delay of construction projects and 2) provide suggestions in relation to the prevention of such delay. The sample is 520 people who were working for different construction projects. They were project managers, project engineers, field engineers, and foremen. The data were collected by using online questionnaires and analyzed to find out mean, standard deviation (SD), frequency, correlation coefficient, and confirmatory factor analysis. The findings reveal two significant aspects. First, those who were working in the construction projects concerned about the factors affecting the delay of the projects at high level. Respectively, the factors related to design, resource, external factors and others were taken into consideration. The factor regarding to work performance is regarded affecting the project delay at the highest level. Other factors, i.e., the design, external factors and others, and resource have the affects at the lower level. Second, the work-related factors can help prevent the project delay. In other words, the construction plan and methods as well as the project management should be well-implemented in accordance with the design. The construction site should be on inspection considering its drawing. Regarding the external factors and others, the public voices of those living around the construction site should be taken into consideration. Furthermore, the effective use of the resources can be carried out by sufficiently preparing all materials, tools, and equipment for constructing any project effectively as a consequence.
    URI
    http://repository.rmutp.ac.th/handle/123456789/4001
    Collections
    • Journal Articles [688]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV