Repository LOGO
    • Login
    View Item 
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Office of the President (สำนักงานอธิการบดี)
    • International Affairs Division
    • The 2nd RMUTP International Conference Green Technology and Productivity
    • View Item
    •   Intellectual Repository at Rajamangala University of Technology Phra Nakhon
    • Office of the President (สำนักงานอธิการบดี)
    • International Affairs Division
    • The 2nd RMUTP International Conference Green Technology and Productivity
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Improvement of Efficiency in Biodegradable Packaging Process

    Thumbnail
    View/Open
    42. E. Warinsiriruk.pdf (103.6Kb)
    Date
    2010-11-22
    Author
    Sritarathorn, K.
    Mounjun, P.
    Warinsiriruk, E.
    Metadata
    Show full item record
    Abstract
    This industrial research was studied an improvement of efficiency in natural fiber production plant. The objective was improvement process by using IE techniques which this method was once green technology for industrial problems solving. Now, process had build-up in process (WIP) due to unbalance times between trimming station and visual inspection of station. Therefore, the research studied work of staffs; time study and data analysis through 5W1H were used for analysis of WIP root cause. The cause of problems founded were the transportation loss of between section had over necessity and loss of visual inspection for repair. Therefore, it had bottleneck in process. Consequently, the researchers applied ECRS in each working processed by separation of repair station. Repairs of items were isolated from the main flow path of the process. Calculating of work flow rate was used for identified operator for repair station. As a result of the above production improvement, Times of visual inspection in a lot was decrease from 283.84 hrs to 160.19 hrs. It was decreased in 43.56%. In addition, the effect of separation from the repair process made the total times of all process was decreased from 792.78 hrs/lot to 669.14 hrs/lot. It was decreased in 15.60% and decreased work in process had from 17 lots/day to no work in process.
    URI
    http://repository.rmutp.ac.th/handle/123456789/717
    Collections
    • The 2nd RMUTP International Conference Green Technology and Productivity [62]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     


    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV